云南冶金2026,Vol.55Issue(4):24-29,6.
富水型地下磷矿山联络道涌水封闭墙构建与控排技术
Construction and Water-Blocking Bulkhead and Control-Drainage Technology for Water Inrush in Connecting Roadway of Water-rich Underground Phosphate Mine
摘要
Abstract
Water inrush hazards severely threaten the safe production of water-rich phosphate mines.Aiming at the sudden water inrush occurring in the crossheading of the 2 000 m level of an underground phosphate mine under conditions of high water pressure and fractured phosphate rock surrounding rock,a systematic treatment scheme integrating"water blocking via bulkhead+water drainage & regulation through diversion conduits+multi-stage drainage"was designed and implemented.The core technologies of this scheme are as follows:1)An inverted wedge flat C30 concrete bulkhead with a thickness of 1.5 m was constructed 5 m ahead of the water inrush point to block the main water flow channels;2)Seamless steel pipes with specifications of φ159 mm×4 mm×6 m were pre-embedded inside the wall and connected to high-pressure valves externally to realize precise regulation of water inflow rate;3)The existing underground reservoirs and multi-stage drainage facilities of the mine area were optimized and operated in linkage.Engineering practice results show that the system drainage capacity increased from 460 m3/h to 522 m3/h,the water inflow rate dropped from over 200 m3/h to 100 m3/h,the water pressure behind the sealing wall decreased to ≤0.3 MPa,and the efficiency of the drainage system rose from 88%to 95%.This scheme provides an engineering reference for water inrush control in underground mines with similar high water pressure and fractured surrounding rock conditions.关键词
地下矿山/涌水治理/封闭墙/导流控压/多级排水Key words
underground mine/water inrush control/bulkhead/diversion and pressure regulation/multi-stage drainage分类
矿业与冶金引用本文复制引用
王金华,高家凡,张佳男,曹得志,董健,朱德勇..富水型地下磷矿山联络道涌水封闭墙构建与控排技术[J].云南冶金,2026,55(4):24-29,6.基金项目
国家自然科学基金资助项目(52204160) (52204160)
中国博士后科学基金资助项目(2022MD713814) (2022MD713814)