黄河供水型水库库容计算方法研究

王淇 王浩 景何仿 麻小华 宋建文 周超 拓明方

中国农村水利水电Issue(9):41-49,56,10.
✕
中国农村水利水电Issue(9):41-49,56,10.DOI:10.12396/znsd.2501535

黄河供水型水库库容计算方法研究

Study on Calculation Methods of Storage Capacity of the Yellow River Water-Supply Reservoirs

王淇 1王浩 2景何仿 3麻小华 2宋建文 2周超 2拓明方2

作者信息

  • 1. 北方民族大学 土木工程学院,宁夏 银川 750021
  • 2. 宁夏水投中卫水务有限公司,宁夏 中卫 755000
  • 3. 北方民族大学 土木工程学院,宁夏 银川 750021||北方民族大学 数值计算与工程应用研究所,宁夏 银川 750021
  • 折叠

摘要

Abstract

Water-supply reservoirs,as important infrastructure that supports both industrial water supply and domestic water supply,are characterized by frequent fluctuations in water level;consequently,it is necessary to establish an accurate relationship between water level and storage capacity in order to realize refined scheduling,to further clarify the applicability of different calculation methods in the measurement of storage capacity for water-supply reservoirs,and to achieve effective management of such reservoirs as well.Taking the Zhaobishan Reservoir,which withdraws water from the Shapotou North Main Canal in the upper reaches of the Yellow River,as the example,this study obtains above-water and underwater topographic data through the combined use of low-altitude UAV aerial photogrammetry and an unmanned surface vessel-mounted echo sounder.The ArcMap module within ArcGIS software is used to realize spatial integration of both the above-water terrain data and the underwater reservoir-bed elevation data,thereby generating a high-precision digital elevation model(DEM)that fully covers the entire reservoir area.Three methods,namely the DEM method,the contour volume method(CVM),and the cross-section method(CSM),are applied to calculate the reservoir storage capacity under different water-level conditions and plot storage capacity curves.For the storage capacities computed by the above three methods for partitioned segments between the dead water level and the check flood level of the Zhaobishan Reservoir,verification and rechecking are carried out with South CASS software.The results of the study indicate that CVM attains the highest accuracy together with the best stability across the full water-level range,remaining stably within 0.21%to 0.23%at the key levels of normal storage level 1 311.20 m,design flood level 1 311.60 m,and check flood level 1 312.00 m,and in particular it is therefore recommended as the preferred method for the calculation of storage capacity in water-supply reservoirs.The DEM method performs well within the high water-level range,achieving relative error levels between 0.05%and 1.78%and thus serving as an alternative method under specific water-level conditions.The CSM exhibits relative errors between 3.54%and 12.89%across the full water-level range and is not suitable for the storage-capacity calculation of water-supply reservoirs.Finally,on the basis of calculation data derived from CVM,a shifted power function water level-water surface area relationship model and a cubic polynomial water level-storage capacity relationship model are established,thereby achieving the transformation from discrete data to continuous functional representations.The technical workflow constructed in this study,consisting of the sequential steps of data acquisition,method comparison,error evaluation,and model establishment,provides a reliable basis for refined calculation of reservoir storage capacity and reservoir scheduling of water-supply reservoirs.

关键词

照壁山水库/库容/数字高程模型法/等高线/断面法/数据拟合

Key words

Zhaobishan Reservoir/storage capacity/DEM/contour lines/CSM/Data fitting

分类

建筑与水利

引用本文复制引用

王淇,王浩,景何仿,麻小华,宋建文,周超,拓明方..黄河供水型水库库容计算方法研究[J].中国农村水利水电,2026,(9):41-49,56,10.

基金项目

国家自然科学基金(12461084,12462027) (12461084,12462027)

宁夏自然科学基金(2023AAC02049),(2025AAC030205) (2023AAC02049)

宁夏高等学校科学研究项目(NYG2024090) (NYG2024090)

北方民族大学科学计算与工程应用创新团队(2022PT_S02). (2022PT_S02)

中国农村水利水电

1007-2284

访问量0
|
下载量0
段落导航相关论文