| 注册
首页|期刊导航|中国铁道科学|高速铁路1.5~10m波段轨道几何不平顺控制标准

高速铁路1.5~10m波段轨道几何不平顺控制标准

李国龙 杨飞 尹峰 庞志强 魏子龙 刁洪宝 强伟乐

中国铁道科学2026,Vol.47Issue(4):92-104,13.
✕
中国铁道科学2026,Vol.47Issue(4):92-104,13.DOI:10.3969/j.issn.1001-4632.2026.04.07

高速铁路1.5~10m波段轨道几何不平顺控制标准

Control standards for track geometry irregularity in the 1.5-10 m wavelength band of high-speed railways

李国龙 1杨飞 1尹峰 1庞志强 1魏子龙 1刁洪宝 1强伟乐1

作者信息

  • 1. 中国铁道科学研究院集团有限公司 基础设施检测研究所,北京 100081
  • 折叠

摘要

Abstract

To strength the control of track geometry irregularity in the intermediate wavelength band during the operation period of high-speed railway,improve the full-cycle management system for track smoothness,and clarify the coupling relationship between track irregularity excitation and vehicle dynamic response,a management method for track irregularity within the 1.5-10 m band is proposed based on running safety.Based on statistical analysis of field measurements and vehicle-track coupling dynamic simulation,the recommended management values for allowable deviation of track dynamic geometric irregularity in the 1.5-10 m range are provided for different speed levels.Additionally,to facilitate on-site maintenance and repair work,considering the transfer functions between chord lengths and wavelengths as well as the difference between static and dynamic track irregularity,recommended allowable deviation values for track static geometric irregularity using the 5 m mid-chord measurement method are also presented.The results show that:for railway lines operating at 200-250 km·h-1,the recommended values for dynamic longitudinal level irregularity are 3,4,6 and 7 mm,respectively,and for alignment are 3,4,5 and 6 mm;for railway lines operating at 250(exclusive)-350 km·h-1,the values are 2,3,5 and 6 mm for longitudinal level and 2,3,4 and 5 mm for alignment;for railway lines operating at 350(exclusive)-400 km·h-1,the values are 2,3,4,and 5 mm for longitudinal level,with alignment values matching those for 250(exclusive)-350 km·h-1 railway lines.For static geometric track irregularities measured using the 5 m short chord method,the recommended values for routine maintenance,scheduled maintenance,temporary repairs,and speed restriction management are:for 200-250 km·h-1 railway lines,3,4,6 and 7 mm for static longitudinal level irregularity and 3,4,5,and 6 mm for alignment;for 250(exclusive)-350 km·h-1 railway lines,2,3,5 and 6 mm for longitudinal level and 2,3,4 and 5 mm for alignment;for 350(exclusive)-400 km·h-1 railway lines,2,3,4 and 5 mm for longitudinal level,with alignment values identical to those for 250(exclusive)-350 km·h-1 railway lines.

关键词

高速铁路/轨道动静态几何不平顺/管理建议值/车辆-轨道耦合动力学/中点弦测法

Key words

High-speed railway/Static and dynamic track geometric irregularity/Management recommendation value/Vehicle-track coupling dynamic simulation analysis/Mid-point chord measurement method

分类

交通工程

引用本文复制引用

李国龙,杨飞,尹峰,庞志强,魏子龙,刁洪宝,强伟乐..高速铁路1.5~10m波段轨道几何不平顺控制标准[J].中国铁道科学,2026,47(4):92-104,13.

基金项目

国家重点研发计划项目(2022YFB2603400) (2022YFB2603400)

中国铁道科学

1001-4632

访问量0
|
下载量0
段落导航相关论文