| 注册
首页|期刊导航|制冷|地铁列车空调受限散热分析与改善措施研究

地铁列车空调受限散热分析与改善措施研究

周剑峰 蔡瑞晶 李江鹏 潘昊川 吴妍 王毅峰

制冷2026,Vol.45Issue(4):40-48,9.
✕
制冷2026,Vol.45Issue(4):40-48,9.DOI:10.3969/J.ISSN.1005-9180.2026.04.0007

地铁列车空调受限散热分析与改善措施研究

Research on Limited Heat Dissipation Analysis and Improvement Measures for Metro Train Air Conditioning

周剑峰 1蔡瑞晶 1李江鹏 2潘昊川 2吴妍 3王毅峰2

作者信息

  • 1. 中车南京浦镇车辆有限公司,江苏南京,210031
  • 2. 同济大学汽车与能源学院,上海,200092
  • 3. 同济大学建筑与城市规划学院,上海,200092
  • 折叠

摘要

Abstract

To investigate the heat dissipation characteristics of metro train air conditioning in confined spaces and the role of tunnel over-track exhaust systems,measurements were conducted on three metro lines in a city during typical high-temperature summer days.Parameters including ambient temperature and condenser inlet/outlet air temperatures of the train air conditioning systems were recorded,based on which the heat dissipation capacity and energy efficiency were calculated.Two targeted improvement strategies were subsequently proposed.The results show that due to passenger load and accumulated airflow,the thermal load on intermediate carriages is significantly higher than that on leading cars.In older lines,heat accumulation in the track area results in elevated condenser inlet air temperatures.The enclosed underground space induces exhaust air recirculation,causing condenser inlet temperatures to exceed ambient levels and reducing air conditioning energy efficiency.Activating the over-track exhaust system improves the airflow around the condenser,lowering inlet temperatures and enhancing efficiency.The thermodynamic causes of heat dissipation were identified,providing a practical basis for energy-saving optimization of train systems.Sole reliance on over-track exhaust systems is insufficient for fundamental improvement;instead,structural optimization and coordinated operational strategies are required.By optimizing the height difference between the train and tunnel crown to 1.8-2.3 m,heat dissipation demands can be met under a typical 35-second station dwell time without large-scale civil works.Simultaneously,active load reduction technology compensates by smoothly reducing load before the system approaches high-pressure protection thresholds,thereby preventing fault-induced shutdowns.Under low passenger loads,the active load reduction strategy achieves 50%load regulation,while under high loads it maintains operation within a critical range,ensuring system continuity from the perspective of shutdown prevention.

关键词

地铁车辆/列车空调/受限空间/隧道轨顶排风/改善措施

Key words

Metro Vehicle/Train Air Conditioning/Confined Space/Tunnel Track Top Exhaust/Improvement Measures

分类

交通工程

引用本文复制引用

周剑峰,蔡瑞晶,李江鹏,潘昊川,吴妍,王毅峰..地铁列车空调受限散热分析与改善措施研究[J].制冷,2026,45(4):40-48,9.

基金项目

中国中车股份有限公司科技研究开发计划项目(项目编号:2024CCB218) (项目编号:2024CCB218)

制冷

1005-9180

访问量0
|
下载量0
段落导航相关论文