露天矿坑改造抽水蓄能输水发电系统布置研究

任天卫 李冰 蒋逵超 张吉良 邢钰 丁晴晴

水力发电2026,Vol.52Issue(10):38-43,6.
✕
水力发电2026,Vol.52Issue(10):38-43,6.

露天矿坑改造抽水蓄能输水发电系统布置研究

Layout of Water Conveyance and Power Generation System for Pumped-storage Power Station Renovated from Open-Pit Mine

任天卫 1李冰 1蒋逵超 1张吉良 1邢钰 1丁晴晴1

作者信息

  • 1. 中国电建集团北京勘测设计研究院有限公司,北京 100024
  • 折叠

摘要

Abstract

The renovation of abandoned open-pit mines into pumped-storage power stations faces specific challenges including complex mined-out area distribution,soft rock conditions,and the absence of surge chamber arrangement conditions.Taking the Fuxin Haizhou Open-Pit Mine Project as an example,this paper proposes a layout scheme for the water conveyance and power generation system applicable to mine renovation in soft rock areas.The scheme adopts a single vertical shaft layout to precisely avoid mined-out areas,employs a semi-underground powerhouse to circumvent risks of large underground caverns,integrates emergency gates with intake/outlet structures based on existing experiences to eliminate independent gate shafts,and under the condition without surge chambers,controls the water inertia time constant within the allowable range through pipe diameter optimization.Results indicate that the scheme successfully avoids the mined-out area concentration zone at depths of-170 m to-200 m,with Tw=1.91 s and Tws=1.72 s meeting code requirements,and the head loss accounts for only 1.32%of the rated head.

关键词

露天煤矿/抽水蓄能电站/采空区/输水发电系统/竖井布置/软岩地区

Key words

open-pit coal mine/pumped-storage power station/mined-out area/water conveyance and power generation system/shaft layout/soft rock area

分类

建筑与水利

引用本文复制引用

任天卫,李冰,蒋逵超,张吉良,邢钰,丁晴晴..露天矿坑改造抽水蓄能输水发电系统布置研究[J].水力发电,2026,52(10):38-43,6.

基金项目

中国电力建设股份有限公司科技项目(DJ-ZDXM-2022-03) (DJ-ZDXM-2022-03)

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文