太阳能Issue(9):73-79,7.DOI:10.19911/j.1003-0417.tyn20250616.01
基于实测数据的分布式光伏发电项目仿真分析
SIMULATION ANALYSIS OF DISTRIBUTED PV POWER GENERATION PROJECTS BASED ON MEASURED DATA
秦伟亮 1李鹏 1李利飞1
作者信息
- 1. 中国电建集团河北省电力勘测设计研究院有限公司,石家庄 050000||河北省电力勘测设计技术创新中心,石家庄 050000
- 折叠
摘要
Abstract
The PV power generation project calculates power generation capacity based on mesoscale meteorological data,but its accuracy cannot be determined.This paper analyzes the actual power generation copacity of an operational distributed PV power generation project and conducts simulation modeling using PVsyst software with various mesoscale satellite datasets.The research results show that:1)The annual power generation hours of the project vary due to external factors,with the highest at 1291.0 h in 2022 and the lowest at 1183.0 h in 2023,averaging 1252.5 h over the past 4 years.2)The inverter's average power generation hours over 4 years are 1240.75 h at 15° PV bracket tilt angle and 1264.67 h at 25° PV bracket tilt angle.3)The gap between the simulated annual power generation capacity and the actual power generation capacity is smallest when based on the Meteonorm 8.2 database.关键词
分布式光伏发电/光伏组件/PVsyst软件/发电小时数/光伏支架倾角/气象数据库Key words
distributed PV power generation/PV modules/PVsyst software/power generation hours/PV bracket tilt angle/meteorological database分类
信息技术与安全科学引用本文复制引用
秦伟亮,李鹏,李利飞..基于实测数据的分布式光伏发电项目仿真分析[J].太阳能,2026,(9):73-79,7.