云南水力发电2026,Vol.42Issue(9):58-62,5.DOI:10.3969/j.issn.1006-3951.2026.09.016
顶管法在中型水库输水管道中的应用
Application of Top Pipe Method in Medium sized Reservoir Water Transmission Pipeline
李金伟1
作者信息
- 1. 云南保山坝灌区投资建设有限公司,云南 保山 678000
- 折叠
摘要
Abstract
With the continuous progress of urban construction in our country,it is common for water pipelines to pass through existing buildings during the construction process.In this case,the pipe jacking method can be used to quickly and safely complete the construction task by using a hydraulic jacking workstation to push the pipeline to be laid from the jacking work pit without excavating the surface.Taking the process flow of pipe jacking construction technology in water transmission pipelines as the main line,this article conducts in-depth research on working wells,pipe jacking,pipeline construction,etc.,and analyzes the key points of construction technology in each stage.The practical results have proved that using the pipe jacking method to construct similar projects can ensure safety and quality during the construction process.关键词
输水管道/顶管法/沉井/施工质量控制/技术要点Key words
water pipeline/top pipe method/sinking well/construction quality control/technical point分类
建筑与水利引用本文复制引用
李金伟..顶管法在中型水库输水管道中的应用[J].云南水力发电,2026,42(9):58-62,5.