云南水力发电2026,Vol.42Issue(9):89-93,5.DOI:10.3969/j.issn.1006-3951.2026.09.024
南俄5水电站系统变电站拆迁后改造方案设计
Design of the Renovation Plan for Nam Ngum 5 Hydropower Station System Substation after Demolition
摘要
Abstract
EDL plans to demolish Nam Ngum 5 system substation located approximately 1km away from Nam Ngum 5 hydropower station,which will affect the power transmission of Nam Ngum 5 hydropower station.In order to ensure the flexibility and reliability of the power station operation,the relevant equipment of Nam Ngum 5 hydropower station booster station needs to be renovated.The paper summarizes and analyzes the design ideas for the renovation plan of Nam Ngum 5 hydropower station system substation after demolition,as well as the key designs related to the power grid transmission equipment,control protection,and communication equipment of the booster station.关键词
升压站/电气设备/计算机监控系统/保护系统/通信系统Key words
boosting station/electrical equipment/computer monitoring system/protection system/communication system分类
信息技术与安全科学引用本文复制引用
徐涛..南俄5水电站系统变电站拆迁后改造方案设计[J].云南水力发电,2026,42(9):89-93,5.基金项目
中国电建集团科技项目(DJ—ZDXM—2023-43) (DJ—ZDXM—2023-43)