| 注册
首页|期刊导航|云南水力发电|南俄5水电站系统变电站拆迁后改造方案设计

南俄5水电站系统变电站拆迁后改造方案设计

徐涛

云南水力发电2026,Vol.42Issue(9):89-93,5.
✕
云南水力发电2026,Vol.42Issue(9):89-93,5.DOI:10.3969/j.issn.1006-3951.2026.09.024

南俄5水电站系统变电站拆迁后改造方案设计

Design of the Renovation Plan for Nam Ngum 5 Hydropower Station System Substation after Demolition

徐涛1

作者信息

  • 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
  • 折叠

摘要

Abstract

EDL plans to demolish Nam Ngum 5 system substation located approximately 1km away from Nam Ngum 5 hydropower station,which will affect the power transmission of Nam Ngum 5 hydropower station.In order to ensure the flexibility and reliability of the power station operation,the relevant equipment of Nam Ngum 5 hydropower station booster station needs to be renovated.The paper summarizes and analyzes the design ideas for the renovation plan of Nam Ngum 5 hydropower station system substation after demolition,as well as the key designs related to the power grid transmission equipment,control protection,and communication equipment of the booster station.

关键词

升压站/电气设备/计算机监控系统/保护系统/通信系统

Key words

boosting station/electrical equipment/computer monitoring system/protection system/communication system

分类

信息技术与安全科学

引用本文复制引用

徐涛..南俄5水电站系统变电站拆迁后改造方案设计[J].云南水力发电,2026,42(9):89-93,5.

基金项目

中国电建集团科技项目(DJ—ZDXM—2023-43) (DJ—ZDXM—2023-43)

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文