| 注册
首页|期刊导航|湖南工业大学学报|暗挖隧道近距离斜下穿既有地铁车站的影响分析

暗挖隧道近距离斜下穿既有地铁车站的影响分析

晏俊杰 祝磊 吴天祚

湖南工业大学学报2026,Vol.40Issue(5):10-18,9.
✕
湖南工业大学学报2026,Vol.40Issue(5):10-18,9.DOI:10.20271/j.cnki.1673-9833.2026.5002

暗挖隧道近距离斜下穿既有地铁车站的影响分析

Impact Analysis of Underground Tunnels Underpassing Subway Stations at a Close Distance Diagonally

晏俊杰 1祝磊 2吴天祚3

作者信息

  • 1. 安徽建筑大学 土木工程学院,安徽 合肥 230601||合肥大学 城市建设与交通学院,安徽 合肥 230601
  • 2. 合肥大学 城市建设与交通学院,安徽 合肥 230601||合肥大学 城市轨道交通安全与应急管理安徽省重点实验室,安徽 合肥 230601
  • 3. 中铁三局集团 华东建设有限公司,江苏 南京 211106
  • 折叠

摘要

Abstract

In order to evaluate the control effect of different reinforcement measures on the displacement of surface,station and tunnel initial support,and verify the engineering applicability of the comprehensive reinforcement scheme,taking the construction background of the underground tunnel of Hefei Metro Line 8,which underpasses the existing Line 3 Yilijing Station at a close distance diagonally.MIDAS GTS NX finite element software is used to simulate five working conditions:no reinforcement,temporary arch,grouting reinforcement,anchor rod and comprehensive reinforcement.The results indicate that under the unreinforced condition,the maximum settlements of the ground surface,station,and initial support reach 21.31,6.36,16.21 mm,respectively,all exceeding the specified limits.Among single reinforcement measures,the temporary inverted arch significantly reduces settlements by 27.59%,50.31%,33.99%through rigid support;grouting reinforcement suppressed initial support settlement by 24.55%via surrounding rock improvement but shows limited effectiveness on the ground surface and stations(reductions<15%);bolt reinforcement exhibits minimal impact(reductions<6%).Through the collaborative mechanism of"rigid support surrounding rock improvement local anchoring",the comprehensive reinforcement reduces the settlement to 13.34,2.15,6.93 mm respectively(with a reduction of 36.98%,66.19%,57.25%),all of which meet the requirements of the specifications.The measured data and simulation results show close agreement with simulation results,verifying the reliability of the model and the feasibility of the comprehensive reinforcement scheme.

关键词

暗挖隧道/地铁车站/下穿/位移/数值模拟

Key words

underground tunnel/subway station/underpassing/displacement/numerical simulation

分类

交通工程

引用本文复制引用

晏俊杰,祝磊,吴天祚..暗挖隧道近距离斜下穿既有地铁车站的影响分析[J].湖南工业大学学报,2026,40(5):10-18,9.

基金项目

安徽省自然科学基金资助项目(2008085ME168) (2008085ME168)

安徽省重点研究与开发计划标准化专项基金资助项目(202004h7020002) (202004h7020002)

湖南工业大学学报

1673-9833

访问量0
|
下载量0
段落导航相关论文