电力系统自动化2026,Vol.50Issue(19):136-146,11.DOI:10.7500/AEPS20251114003
面向绿电消纳与算力迁移收益的多数据中心三阶段迁移模型
Three-stage Migration Model of Multiple Data Centers for Green Power Accommodation and Computing Power Migration Profit
摘要
Abstract
In response to the coexistence problems arising from the rapid growth of computing power scale,including surge increment of data center loads,the local power shortages and green power curtailment,and the practical problems of the insufficient incentive for data center operators to participate in scheduling,this paper proposes a three-stage migration model of multiple data centers for green power accommodation and computing power migration profit.In the first stage,following the priority scheduling sequence of green power,the maximum flow algorithm is adopted to realize the capacity matching between green power and the power consumption of transferable load.In the second stage,a greedy algorithm is employed for secondary scheduling to further enhance economic efficiency.In the third stage,migration paths are adjusted again to support the coordinated accommodation of local and inter-regional green power.Simulation results demonstrate that the proposed model can simultaneously improve the revenue of data center operators and the economic benefits of power grids,alleviate the power supply pressure of individual data centers,and guarantee the compliance of service level agreements,realizing the win-win collaborative optimization among computing power,electric power,and green power accommodation.关键词
数据中心/电-算协同/绿电消纳/需求响应/时空协同Key words
data center/electric power-computing power coordination/green power accommodation/demand response/spatio-temporal collaboration引用本文复制引用
张良,王昊,王殿彬,张晖,张志鹏,吕玲..面向绿电消纳与算力迁移收益的多数据中心三阶段迁移模型[J].电力系统自动化,2026,50(19):136-146,11.基金项目
吉林省重大科技专项资助项目(20240204001SF). This work is supported by Jilin Provincial Major Science and Technology Special Project of China(No.20240204001SF). (20240204001SF)