摘要

Abstract

Aiming at the challenges of insufficient economy and synergy of pipeline-network layout and equipment selection in energy stations in integrated energy system planning,from the engineering practice,based on the magnitude gap between the investment costs of energy stations and pipeline networks,a two-stage station-network collaborative planning method of"master-then-slave"is proposed.In the first stage,taking the siting and sizing of the energy station considering the equipment selection as the leading factor,ignoring the impact of common path,the point weight is reconstructed into a comprehensive function including equipment investment,operation and maintenance,energy purchase and carbon emission costs by introducing the integer variable of equipment selection,and an improved P-median model considering the"equipment-station-network"coupling is established.In the second stage,the focus is placed on addressing the issue of common path in the pipeline-network layout.A flow balance-based correction model for the pipeline-network layout is developed,which introduces topological constraints between paths and edges to avoid the duplicate accounting of construction costs for common paths and its impact on the pipeline-network layout.The case study results demonstrate that the proposed method realizes the collaborative planning of equipment selection and sizing,energy station siting and pipeline-network layout,and the economy of the planning scheme is significantly improved.

关键词

综合能源系统/能源站/设备选型/管网布局/协同规划

Key words

integrated energy system/energy station/equipment selection/pipeline-network layout/collaborative planning

引用本文复制引用

黄大为,陈伟,于娜,孔令国..考虑设备选型和公共路径的综合能源系统站网协同规划[J].电力系统自动化,2026,50(19):180-188,9.

基金项目

国家重点研发计划资助项目(2018YFB1503101) (2018YFB1503101)

国家自然科学基金资助项目(51907021). This work is supported by National Key R&D Program of China(No.2018YFB1503101)and National Natural Science Foundation of China(No.51907021). (51907021)