At present,China has achieved remarkable progress in the construction of well-facilitated farmland.However,insufficient attention has been paid to the post-construction management and maintenance(PCMM),which has affected the long-term usage of well-facilitated farmland.To enhance the PCMM level of well-facilitated farmland,it is urgent to carry out research on this field,which should be adapted to regional conditions.This study focused on 86 banners(counties)in Inner Mongolia which were involved in well-facilitated farmland construction projects.By using the method based on the combination of questionnaire surveys and quantitative analysis,it discussed the current entities and models,main challenges and potential influencing factors of PCMM.In addition,the recommendations for PCMM were proposed.The results were indicated as follows.(1)In Inner Mongolia,a diversified management and maintenance model involving multiple stakeholders had generally been established,in which village collectives occupied a prominent leading position;(2)Four major challenges constrained the PCMM level of well-facilitated farmland:funding shortages,the complex and multifaceted nature of PCMM tasks,insufficient professional capacity and difficulties in implementing accountability mechanisms;(3)The PCMM level of well-facilitated farmland was influenced by potential factors,such as land transfer and agricultural production conditions,topographical characteristics and rural labor force.According to the findings,this study proposes that the PCMM level of well-facilitated farmland can be improved in the following ways.(1)Develop an integrated mechanism for the construction,management and maintenance of well-facilitated farmland;(2)Establish a risk assurance mechanism for management and maintenance;(3)Explore a classified management and maintenance system.Therefore,this study could provide valuable references for enhancing the management and maintenance effectiveness of well-facilitated farmland in Inner Mongolia and other regions across China.

关键词

高标准农田/农田建设/建后管护/管护模式/管护效果

Key words

well-facilitated farmland/farmland construction/post-construction management and maintenance/management and maintenance model/management and maintenance effect

分类

农业科技

引用本文复制引用

南茜,潘龙,丁小明,张学军,张凤平,张月红,曹楠..内蒙古高标准农田建后管护初探及启示[J].中国农业资源与区划,2026,47(9):164-173,10.

基金项目

农业农村部规划设计研究院自主研发计划项目"西北区高标准农田建后管护模式研究"(QX202402) (QX202402)

农业农村部规划设计研究院高标准农田建设与评价研究创新团队项目(CXTD-2024-06) (CXTD-2024-06)

中国农业资源与区划

OACHSSCD

1005-9121

访问量0
|
下载量0
段落导航相关论文