电网技术2026,Vol.50Issue(10):4031-4040,中插33-中插35,13.DOI:10.13335/j.1000-3673.pst.2025.1179
风电场送出线路短路故障下面向电压支撑和有功维持的机组功率协同优化
Coordinated Power Optimization of Wind Turbines for Voltage Support and Active Power Maintenance Under Short-circuit Faults in Wind Farm Transmission Lines
摘要
Abstract
As wind power penetration continues to increase in power systems,wind farms must not only maintain uninterrupted grid connection during voltage dips but also inject reactive current to support point-of-common-coupling(PCC)voltage recovery.Although the magnitude of reactive current affects voltage support effectiveness,excessive reactive current generation may lead to active power curtailment.Consequently,improper power dispatch settings during voltage sags can simultaneously challenge both grid frequency and voltage stability.To address this issue,this paper proposes a coordinated power-optimization control method for wind farms that leverages voltage support and active power stability during faults.An iterative identification method is developed to pinpoint fault locations and transition resistance in transmission lines when grid parameters are unknown.Using identified parameters,this paper analyzes the optimal voltage support mechanism at the PCC and identifies critical constraints arising from current limits,active power boundaries,and transient stability requirements.Furthermore,a multi-machine coordinated optimization model balancing voltage support and active power stability is formulated and transformed into a standard second-order cone programming(SOCP)problem.Simulations under various short-circuit ratios(SCR)and voltage dip magnitudes demonstrate the method's efficacy in achieving optimal voltage support while minimizing active power curtailment.关键词
风电场站/电压跌落/低电压穿越/最优电压支撑/有功功率稳定Key words
wind farm/voltage dip/low voltage ride through/optimal voltage support/active power stability分类
信息技术与安全科学引用本文复制引用
范越,赵琛,牛拴保,段潇涵,汪莹,李鹏瀚,孙丹,年珩..风电场送出线路短路故障下面向电压支撑和有功维持的机组功率协同优化[J].电网技术,2026,50(10):4031-4040,中插33-中插35,13.基金项目
国家电网有限公司西北分部科技项目(SGNW0000FGJS2400319).Project Supported by Science and Technology Project of Northwest Branch of State Grid Corporation of China(SGNW0000FGJS2400319). (SGNW0000FGJS2400319)