摘要
Abstract
To address the issues of short-circuiting,dead zones,and fluctuations in purification efficiency observed during the operation of the Jiulianwei multi-pond constructed wetlands,this study constructs a hydrodynamic-water quality-water ecology hierarchical coupling model based on"macroscopic system-microscopic unit",and simulates and evaluates three optimization scenarios:baffles,artificial islands and ecological water replenishment.Results indicate that the introduction of baffles significantly increased the effective volume ratio,and the short-circuiting phenomenon was basically eliminated.The combined configuration of organically shaped islands and baffles based on Delft3D optimization achieved the best performance in enhancing hydraulic efficiency and reducing the area of dead zones.Under an ecological replenishment rate of 70,000 t/d,the water age in the multi-pond purification zone was significantly reduced,and stagnant water areas were notably diminished.Simulations of pollutant dynamics showed marked declines in ammonia nitrogen,total nitrogen,and total phosphorus concentrations,with purification curves gradually stabilizing.This study proposes an integrated regulation strategy combining"offshore organic islands+baffles+ecological water replenishment"offering robust data support and technical guidance for the operational optimization of similar constructed wetlands.关键词
多塘人工湿地/水动力优化/生态补水/水质净化/耦合模型/运行调控Key words
multi-pond constructed wetlands/hydrodynamic optimization/ecological water replenishment/water quality purification/coupled models/operational control分类
建筑与水利