Abstract

To reduce the inundation risk in the villages upstream of Huanshui Village within the Daluze and Ningjinbo flood detention and retention areas,caused by the superposition of river floods and poor downstream discharge,this study investigates the effectiveness of flood detention and peak-staggering operation of the Renze Plain storage and regulation project.Through hydrological calculations and comparative analysis of multiple flood routing schemes,the optimal project layout and operation plan were determined.The project is divided into three zones,with a total storage capacity of 32 million m³.The results show that the project can intercept floods from the Shami River,Nanli River,and Shunshui River with a return period of 5 to 10 years,and achieve peak-staggering operation through zonal flood detention.In the event of a basin-wide flood,the inundated area can be reduced from over 130 km² to less than 25 km²,the flood risk to surrounding villages is significantly lowered,and the flood protection standard can be raised to a 1-in-10-year level.The findings of this study can serve as a reference for the precise operation of flood detention and retention areas and the development of flood control systems in plain regions.

关键词

任泽平原/调蓄工程/蓄滞洪区/分区滞洪/错峰调度/防洪效益

Key words

Renze Plain/storage and regulation project/flood detention and retention area/zonal flood detention/peak-staggering operation/flood control benefits