长江科学院院报2024,Vol.41Issue(1):1-8,8.DOI:10.11988/ckyyb.20221693
金沙江下游梯级水库提前蓄水策略
In-advance Refill Strategy for Cascade Reservoirs in Lower Jinsha River
摘要
Abstract
In recent years,the issue of refilling cascade reservoir group in the upper Yangtze River at the end of flood season has become increasingly prominent.Ensuring flood control safety while raising the reservoir water level and facilitating a smooth connection between flood control and reservoir refill operations is of particular importance.Using power generation and water utilization rate as evaluation criteria,we investigated the strategy of in-advance water refill during flood season(July to August)for cascade reservoirs in lower Jinsha River,namely Wudongde,Baihetan,Xiluodu,and Xiangjiaba.The findings indicate the following:1)In normal(50%),low(75%),and extremely low(90%)inflow conditions,the reservoir water level for Wudongde and Baihetan should be raised in advance as much as possible,with priority given to Wudongde.Specifically,regardless of whether the inflow in Au-gust is normal or low,if the inflow in July is normal,the water level of Wudongde should be raised above 960 m as a priority.On the other hand,if the inflow in July is low,the water level of Wudongde should be raised above 954 m as a priority.2)For Xiluodu,regardless of the inflow conditions,it is advisable to raise the reservoir water level as much as possible,while ensuring it does not exceed 585 m.关键词
提前蓄水策略/金沙江下游/梯级水库/防洪库容/综合效益Key words
in-advance refill strategy/lower Jinsha River/cascade reservoirs/flood control storage/comprehensive benefits分类
水利科学引用本文复制引用
龚文婷,曹瑞,谭政宇,邢龙,王玮玉,朱文丽,李帅..金沙江下游梯级水库提前蓄水策略[J].长江科学院院报,2024,41(1):1-8,8.基金项目
国家重点研发计划项目(2021YFC3200303) (2021YFC3200303)
国家自然科学基金长江联合基金项目(U2340205,U2040218) (U2340205,U2040218)
国家自然科学基金项目(52109024) (52109024)