北京铁路枢纽客运站分工研究OA
Work Division of Passenger Stations in Beijing Railway Hub
随着北京丰台站改建完成以及北京城市副中心站建设,再加上规划线路相继建设运营,亟需对北京枢纽进行客运站的重新分工.综合把握北京铁路枢纽客运系统总体布局及路网规划,总结铁路枢纽客运站分工影响因素、分工模式及分工基本原则,分析了北京枢纽各客运站分工具体情况,包括现状分工及现存问题,基于分工原则,以线网近期规划为背景,考虑车站能力及车流径路的合理性并综合考虑其他影响因素,有针对性地提出合理的分工调整思路和方案,为北京枢纽地区运营规划提供决策意见,对提高北京铁路枢纽整体能力及运输效率,促进京津冀地区协同发展具有重要的理论和现实意义.
With the completion of the Beijing Fengtai station reconstruction and the construction of the Beijing Sub-central station,along with the successive construction and operation of the planned lines,there is an urgent need to reorganize the passenger station assignments within the Beijing hub.This paper comprehensively grasped the overall layout and road network planning of the passenger transport system in the Beijing railway hub.It summarized the influencing factors,division mode,and basic principles of division of labor among railway hub passenger stations.Additionally,it analyzed the specific division of labor situations in each passenger station at the Beijing hub,including the current division of labor and existing problems.Based on the division of labor principle,this paper took the recent railway network planning as its background.It assessed the rationality of station capacity and vehicle flow paths,while also conducting a comprehensive evaluation of other influencing factors.The study put forward targeted and reasonable ideas and plans for adjusting the division of labor,providing decision-making opinions for the operational planning of the Beijing hub area.Consequently,the study holds substantial theroretical and practical significance for improving the overall capacity and transportation efficiency of the Beijing railway hub,as well as for promoting the coordinated development of the Beijing-Tianjin-Hebei region.
陈佳佩;王永成;张伦;吕红霞
西南交通大学 交通运输与物流学院,四川 成都 610031||西南交通大学 综合交通运输智能化国家地方联合工程实验室,四川 成都 610031||西南交通大学 综合交通大数据应用技术国家工程实验室,四川 成都 610031中国铁路北京局集团有限公司 运输部,北京 100891京津冀城际铁路投资有限公司 发展规划部,北京 100097
交通运输
铁路客运枢纽客运站分工分工调整新建车站枢纽布局
Railway Passenger Transport HubDivision of Labor at Passenger StationsDivision of Labor AdjustmentNewly-built StationsHub Layout
《铁道运输与经济》 2024 (002)
47-53 / 7
国家自然科学基金项目(52072314);国家重点研发计划项目(2017YFB1200702);中国铁路北京局集团有限公司科技研究开发计划课题(2021BY02)