铁道运输与经济2024,Vol.46Issue(2):47-53,7.DOI:10.16668/j.cnki.issn.1003-1421.2024.02.06
北京铁路枢纽客运站分工研究
Work Division of Passenger Stations in Beijing Railway Hub
摘要
Abstract
With the completion of the Beijing Fengtai station reconstruction and the construction of the Beijing Sub-central station,along with the successive construction and operation of the planned lines,there is an urgent need to reorganize the passenger station assignments within the Beijing hub.This paper comprehensively grasped the overall layout and road network planning of the passenger transport system in the Beijing railway hub.It summarized the influencing factors,division mode,and basic principles of division of labor among railway hub passenger stations.Additionally,it analyzed the specific division of labor situations in each passenger station at the Beijing hub,including the current division of labor and existing problems.Based on the division of labor principle,this paper took the recent railway network planning as its background.It assessed the rationality of station capacity and vehicle flow paths,while also conducting a comprehensive evaluation of other influencing factors.The study put forward targeted and reasonable ideas and plans for adjusting the division of labor,providing decision-making opinions for the operational planning of the Beijing hub area.Consequently,the study holds substantial theroretical and practical significance for improving the overall capacity and transportation efficiency of the Beijing railway hub,as well as for promoting the coordinated development of the Beijing-Tianjin-Hebei region.关键词
铁路客运枢纽/客运站分工/分工调整/新建车站/枢纽布局Key words
Railway Passenger Transport Hub/Division of Labor at Passenger Stations/Division of Labor Adjustment/Newly-built Stations/Hub Layout分类
交通工程引用本文复制引用
陈佳佩,王永成,张伦,吕红霞..北京铁路枢纽客运站分工研究[J].铁道运输与经济,2024,46(2):47-53,7.基金项目
国家自然科学基金项目(52072314) (52072314)
国家重点研发计划项目(2017YFB1200702) (2017YFB1200702)
中国铁路北京局集团有限公司科技研究开发计划课题(2021BY02) (2021BY02)