隐伏溶洞对隧道开挖稳定性影响研究OA

Study on the Impact of Hidden Karst Caves on Tunnel Excavation Stability

中文摘要英文摘要

研究隐伏溶洞对隧道开挖稳定性的影响,对于提高隧道工程的安全性和可行性具有重要意义.以呼北高速金岩隧道为工程背景,采用Midas GTS NX软件建立隧道三维有限元模型,研究了不同溶洞位置、不同溶洞大小和不同溶洞与隧道间距下隧道围岩塑性区发展以及隧道衬砌结构变形受力规律.研究结果表明:位于隧道侧面的溶洞对隧道开挖稳定性影响最为明显,围岩塑性区分布最广,其次为位于隧道底部的溶洞,最后为位于隧道顶部的溶洞;溶洞与隧道间距越小,对隧道开挖稳定性影响越大,当距离足够近时塑性区的发展会贯通隧道与溶洞之间的中岩柱;地表V形影响区随着溶洞直径的增大而增加,也随着溶洞与隧道间距的增大而增加;中岩柱的破坏是由隧道侧面的围岩和溶洞侧面岩体同时向中间产生塑性发展而产生的.相关结论可为岩溶发育区山岭隧道安全施工提供参考.

That study of the impact of hidden karst caves on the stability of tunnel excavation is very important for enhancing the safety and feasibility of tunnel engineering projects.Taking the Jinyan Tunnel of the Huhhot-Beihai Expressway as an example,a 3D finite element model of the tunnel was established by Midas GTS NX software to study the development of the plastic zone in the surrounding rock of the tunnel and the deformation and stress pat-terns of the tunnel lining under different locations,sizes,and distances between the karst cave and tunnel.The re-sults show that karst caves located laterally to the tunnel have the most significant impact on tunnel stability with the largest distribution of plastic zones in the surrounding rock.Followed by karst caves located at the bottom of the tun-nel,and finally,those at the top of the tunnel;The shorter the distance between the karst cave and tunnel,the greater the impact on tunnel stability.When the distance is sufficiently short,the development of the plastic zone will through the middle rock column between the tunnel and the karst cave;The surface V-shaped influence zone increases with the diameter increase of the karst cave as well as the distance between the karst cave and tunnel;The failure of the middle rock column is caused by the simultaneous plastic development towards the center from the sur-rounding rock on the side of the tunnel and the rock body on the side of the karst cave.The study can provide refer-ence for the safe construction of mountain tunnels in karst developing areas.

林裕

中冶京诚工程技术有限公司,北京 100176

交通运输

隧道隐伏溶洞稳定性塑性区发展溶洞位置溶洞大小溶洞与隧道间距

tunnelhidden karst cavestabilityplastic zone developmentkarst cave locationkarst cave sizedistance between karst cave and tunnel

《市政技术》 2024 (002)

134-139 / 6

10.19922/j.1009-7767.2024.02.134