Optimization of transfer passenger flow connection schemes under conditions of previous train delays

中文摘要英文摘要

针对列车运行受到干扰下运行图调整问题,对前继列车晚点条件下换乘客流的接续方案进行研究,将换乘客流和在车客流影响最小化作为优化目标对列车运行图进行相应调整.在前继列车晚点条件下,假定换乘客流既可以换乘到原接续列车,也可以选择其他符合换乘条件的列车,建立所有列车上的旅客延误时间最小和换乘失败旅客数量最少的多目标模型,以期在保证换乘成功的前提下最小化列车运行计划调整.以京沪高铁和郑徐高铁上行部分区段为例验证模型的有效性.研究结果表明:当考虑列车总调整时间和换乘客流失败成本相互制约关系时,可以通过增加列车运行调整时间来提高换乘成功客流量;当考虑所有列车上的旅客延误时间和换乘旅客失败成本相互制约关系时,可以通过牺牲部分换乘旅客来减少在车旅客的总延误时间;当其他接续列车空余席位大幅减少时,接续方案倾向于调整原接续列车的到发时刻,避免换乘失败的旅客量大幅增加.

In addressing the challenge of train timetable adjustments due to disruptions in train opera-tions, this study delves into the optimization of transfer passenger flow connection schemes under the conditions of delays in the preceding train. The optimization objectives involve minimizing the impact of transfer passenger flow and in-train passenger flow, prompting corresponding adjustments to the train timetable. In instances where the preceding train is delayed, considering scenarios where transfer passenger flow can shift to the original connecting train or other trains meeting transfer conditions, a multi-objective model is established. This model aims to minimize the overall passenger delay and reduce the number of passengers failing to transfer, ensuring optimal train operation adjustments while guaranteeing successful transfers. Effectiveness of the model is validated using examples from the upward sections of the Beijing-Shanghai high-speed railway and the Zhengzhou-Xuzhou high-speedrailway. The results show that when considering the restrictive relation between the total train adjust-ment time and the failure cost of transfer passenger flow, enhancing the success of transfer passenger flow can be achieved by extending the train timetable adjustment time. When considering the restrictive relation between the total passenger delay and the failure cost of transfer passengers, sacrificing some transfer passengers can reduce the overall passenger delay on the train. In addition, when available seats on other connecting trains are significantly reduced, the scheme tends to adjust the arrival and departure times of the original trains to avoid a large increase in the number of passengers failing to transfer.

刘洋;王志美

北京交通大学交通运输学院,北京 100044

交通运输

高速铁路运行调整换乘接驳列车晚点

high speed railwaytimetable reschedulingtransfer and connectiontrain delay management

《北京交通大学学报》 2024 (001)

147-158 / 12

中国国家铁路集团有限公司科技研究开发计划(N2020X022);贵州省科技计划项目(黔科合支撑2023-一般-139)Science and Technology Research and Development Plan of China National Railway Group Co.,Ltd.(N2020X022);Science and Technology Plan Project of Guizhou Province(Guizhou Science and Technology Cooperation Support 2023-Gen⁃eral-139)

10.11860/j.issn.1673-0291.20230005