超薄玻璃基板深加工项目生产废水预处理工程设计OACSTPCD

Engineering Design of Production Wastewater Pretreatment for Ultrathin Glass Substrate Deep Processing Project

中文摘要英文摘要

某废水处理工程建设规模为 17800 m3/d,文中介绍了该处理工程的概况、工艺流程以及主要构筑物的工艺设计.工程预计进水组成中,工业废水占有相当的比例,主要以电子废水为主.为解决废水可生化性较差、污水处理难度较大的问题,预处理采用高效水解工艺,降低工业废水毒性,改善废水可生化性,确保二级处理系统稳定运行.污水处理主体工艺推荐采用较长泥龄延时曝气,强化脱氮两级AO工艺,提高难降解有机物去除率.绝大部分进水都具有强酸性或者强碱性,且酸碱性波动范围较大,容易对污水处理流程造成冲击,对污水处理建构筑物造成较大腐蚀.此外,在废水处理站进水端设置较长停留时间的调节池,对来水进行均质调节,在一定程度上可以使废水的pH处在较为稳定的范围内;在废水处理站设置监测排放池,尾水排放前仍有应急调节pH的可能,确保尾水达标排放.通过技术经济比较论证,本次扩能工程拟采用不同类污水分质组合处理的工艺技术路线,提高处理效率,降低建设及运行成本.采用先进的上流式水解污泥床水解反应池池型,并加盖除臭、景观绿化,收集和处理构筑物内的臭气.调试运行结果表明,项目工艺流程及参数设置能够满足各类废水处理排放要求.

The construction scale of wastewater treatment engineering is 17800 m3/d,introduced the overview of treatment engineering,process flow,and process design of main structures.In the expected inflow composition of this project,industrial wastewater accounts for a considerable proportion,mainly composed of electronic wastewater.The biodegradability of wastewater is poor,and the difficulty of wastewater treatment is significant.Efficient hydrolysis processes are used for pre-treatment to reduce the toxicity of industrial wastewater,improve the biodegradability of wastewater,and ensure the stable operation of the secondary treatment system.The main process of wastewater treatment is recommended to use a two-stage AO process with longer sludge age,delayed aeration,and enhanced denitrification to improve the removal rate of difficult to degrade organic matter.The vast majority of incoming water has strong acidity or alkalinity,and the fluctuation range of acidity and alkalinity is large,which can easily impact the wastewater treatment process and cause significant corrosion to wastewater treatment buildings.A regulating tank with a long residence time is set at the inlet of the wastewater treatment station to uniformly regulate the incoming water,which can to some extent keep the pH value of the wastewater within a relatively stable range.A monitoring discharge tank is set up at the wastewater treatment station,and there is still a possibility of emergency pH adjustment before tail water discharge to ensure that the tail water meets the discharge standards.Through technical and economic comparison,it is proposed to adopt the process technology roadmap of combined treatment of different types of wastewater by quality in this expansion project,improve processing efficiency and reduce construction and operating costs.And the hydrolysis reaction tank type adopts advanced upflow hydrolysis sludge bed,covered with deodorization and landscape greening,collect and treat odors inside structures.

程炜;章婷婷;慕昕志;朱倩倩

同济大学建筑设计研究院<集团>有限公司,上海 200092||同济大学环境科学与工程学院,上海 200092同济大学苏州研究院,江苏苏州 215101香港科技大学<广州>, 广东广州 511453

土木建筑

污水处理厂工业废水电子废水工艺流程除臭

wastewater treatment plant(WWTP)industrial wastewaterelectronic wastewatertechnological processdeodorization