基于某近接下穿运营线路区间新建洞桩法车站工程,采用数值分析软件对施工过程进行模拟分析,研究运营线路区间变形规律、最大及最小主应力变化趋势和发生位置;现场施工监测的发展趋势、发生位置均与模拟结果拟合度较高,且现场监测值均满足规范要求.

Based on the newly built hole pile method station project which is close to a line section of the underpass,the numerical analysis software is used to simulate the construction process,the deformation law of the operating line section,the variation trend of maximun and minimun principle stress and the occurrence locaton are studied.The development trend of the field construction monitoring,and the occurrence location and the simulation result are highly simulated.The filed monitoring values all meet the requirements of the specification.

宁纪超;李维洲;易领兵;权威;任磊;任方毅;郑力铭;宋欣

中国交建轨道交通事业部(轨道分公司|铁道总院),北京 100088郑州地铁集团有限公司,郑州 450000中铁工程设计咨询集团有限公司,北京 100088中国国家铁路集团有限公司工程管理中心,北京 100088

土木建筑

洞桩法近接下穿区间变形监测位移

hole pile methodproximityunderpassintervaldeformation detectiondisplacement

《路基工程》 2024 (002)

117-122 / 6

河南省科技厅自然科学基金资助项目(162102210188);郑州交通重点工程建设管理中心横向委托资助项目(51000128);河南省建筑业协会科研开发项目(YJX-2023-K01、YJX-2023-K02)

10.13379/j.issn.1003-8825.202306035