| 注册
首页|期刊导航|市政技术|某市河西片区污水管网高水位运行成因分析及对策探讨

某市河西片区污水管网高水位运行成因分析及对策探讨

周文磊 戚心怡

市政技术2024,Vol.42Issue(4):254-260,7.
市政技术2024,Vol.42Issue(4):254-260,7.DOI:10.19922/j.1009-7767.2024.04.254

某市河西片区污水管网高水位运行成因分析及对策探讨

Analysis of Causes and Discussion of Countermeasures for the High Water Level Operation of the Sewage Pipe Network in Hexi Area

周文磊 1戚心怡2

作者信息

  • 1. 广东省冶金建筑设计研究院有限公司,广东广州 510080
  • 2. 广东省环境保护工程研究设计院有限公司,广东广州 510080
  • 折叠

摘要

Abstract

In the Hexi area of a city,the sewage pipe network has been operating at a high water level for a long time.The actual operating water level is 0.88~3.60 m above the pipe top,which is 1.36~4.60 m higher than the normal operating water level.The high water level operation has a significant impact on daily operation and maintenance,pipe inspection and renovation construction and improving the inflow concentration of water purification plants.In order to reduce the operating water level of the sewage pipe network,the various links of the sewage pipe network,the pumping station,and the water purification plant are studied to analyze the reasons for the high water level oper-ation of the local sewage pipe network in Hexi area,and propose engineering measures such as reducing the water level of rivers,temporary water diversion,improving the separation of rainwater and sewage,and repairing the pipe network during the early detection,construction,and operation and maintenance periods.In addition,non engi-neering measures of emphasizing construction and optimizing operation modes are combined to reduce the water lev-el of the sewage pipe network,restore the normal operation function of the sewage pipeline network.

关键词

污水管网/高水位运行/外水入侵/降水位/设施改造

Key words

sewage pipe network/high water level operation/external water intrusion/lowering water level/facility renovation

分类

建筑与水利

引用本文复制引用

周文磊,戚心怡..某市河西片区污水管网高水位运行成因分析及对策探讨[J].市政技术,2024,42(4):254-260,7.

市政技术

1009-7767

访问量3
|
下载量0
段落导航相关论文