|国家科技期刊平台
首页|期刊导航|煤炭与化工|中厚煤层沿空留巷工作面煤柱注浆补强加固技术

中厚煤层沿空留巷工作面煤柱注浆补强加固技术OA

Reinforcing and strengthening technology of coal pillar grouting in gob-side entry retaining with medium and thick coal seam

中文摘要英文摘要

新景矿3109工作面采用沿空留巷回采工艺,由于巷道处于大埋深、中厚煤层条件,且巷道服务周期长,待相邻采面回采复用巷道时,常出现变形量大、失修率高等现象.通过在第一辅助进风巷和回风巷采取打设单体柱抬棚、浇筑柔模墙体、打设绞架木垛和圆木点柱等加固方法,有效控制巷道变形速率.同时,采取对巷旁煤柱实施注浆加固措施,留巷巷道顶板下沉量减少45%,煤柱憋帮量减少51%,降低了沿空留巷巷道的失修率.

The gob-side entry retaining technology was adopted in No.3109 Face of Xinjing Mine.Because the roadway was in the condition of large buried depth and medium thick coal seam,and the service period of roadway was long,the phenomenon of large deformation and high disrepair rate often occured when the roadway was reused in the adjacent mining face.The deformation rate of the roadway was controlled effectively by setting up the single column lifting shed,casting the flexible mold wall,building the gallows pile and the log point column in the first auxiliary air inlet and return air inlet.At the same time,the measures of grouting reinforcement on the coal pillar beside the roadway could effectively control the roof subsidence of the roadway to reduce 45%and the coal pillar wall holding amount to reduce 51%,which greatly reduced the disrepair rate of the roadway along the roadway.

康松松

山西新景矿煤业有限公司,山西阳泉 045000

矿山工程

沿空留巷煤体注浆数值模拟突出矿井复合支护

gob-side entry retainingcoal body groutingnumerical simulationoutburst minecomposite support

《煤炭与化工》 2024 (004)

1-5 / 5

10.19286/j.cnki.cci.2024.04.001

评论