铁路隧道近接工程变形控制标准梳理及工程防护措施研究OA北大核心

Research on Deformation Control Standards and Engineering Protection Measures for Railway Tunnel Close-spaced Engineering

中文摘要英文摘要

随着交通强国战略的持续推进,人们对出行的品质要求越来越高,轨道交通已成为新型城镇化和城市化地区高质量发展的命脉.尤其是城际铁路、市域铁路、地铁等,其主要走行于城区,且以地下敷设为主,形成大量城区隧道.由于城区环境复杂,隧道工程不可避免地上穿、下穿或侧穿既有铁路、地铁、公路、城市主干道、高层建筑等对变形敏感的既有建(构)筑物(以下简称"近接工程").如何保障近接工程在隧道施工期间的正常使用和安全,以及如何合理确定近接工程变形控制标准,是城区隧道工程建设的重点、难点和控制点.本文按近接铁路工程、公路工程、城市轨道交通工程、地下管线等进行分类,系统梳理相关行业标准,研究提出不同环境下隧道的保护范围及要求、施工期间相关近接工程变形控制标准.同时基于控制标准,并结合工程经验,提出一套相对完善的近接工程设计、施工建议措施:勘察阶段应查明工程周边环境情况及场地地质条件;设计阶段在合理布置线路方案、预留足够安全净距的基础上,采用合理的工法和可靠的支护结构体系,设置有效的隔离、保护、加固措施;施工阶段加强超前地质预报和监控量测,并制定完善应急预案.

As the strategy for building China's strength in transportation continues to advance,people's demand for the quality of travel is increasing.Rail transit has become the lifeline for high-quality development in urbanization.Especially for intercity railways,suburban railways,and metros,which are mainly built through urban areas and are mostly laid underground,resulting in numerous urban tunnels.Due to the complex urban environment,tunnels inevitably pass above,below,or alongside existing buildings and structures such as railways,metros,highways,main urban roads,and high-rise buildings(hereinafter referred to as close-spaced engineering).How to ensure the normal operation and safety of close-spaced engineering during tunnel construction,as well as how to reasonably determine the deformation control standards for close-spaced engineering,are the focus,difficulty,and control points of urban tunnel construction.This article categorizes by adjacent railway,highway,urban rail transit,and underground pipelines,systematically sorts out the standards of related industries,and proposes protection ranges and requirements for tunnels in different environments,deformation control standards for close-spaced engineering construction.Based on the control standards and engineering experience,a set of design and construction control measures for close-spaced engineering are proposed:During the survey phase,it is necessary to ascertain the surrounding environment and geological conditions.During the design phase,on the basis of reasonably designing the route scheme and keeping enough safe clearance,adopt reasonable construction methods and reliable supporting structures,and set up effective isolation,protection,and reinforcement measures.During the construction phase,strengthen tunnel geological prediction and monitoring,and establish perfect contingency plans.

巩江峰;卿伟宸;朱宏;张延

中国铁路经济规划研究院有限公司,北京 100038中铁二院工程集团有限责任公司,成都 610031中铁工程设计咨询集团有限公司,北京 100055

交通运输

铁路隧道近接工程变形控制标准变形控制技术工程防护措施

railway tunnelclose-spaced engineeringdeformation controlling standarddeformation controlling techniqueengineering protection measures

《铁道标准设计》 2024 (006)

1-11 / 11