|国家科技期刊平台
首页|期刊导航|压力容器|12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究

12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究OA北大核心CSTPCD

Research of submerged arc welding buildup technology of 12Cr2Mo1V steel boss using additional filing wire

中文摘要英文摘要

针对12Cr2Mo1V钢加氢反应器壳体凸台采用单丝埋弧焊进行堆焊、制造效率低的问题,研究了采用附加填充丝埋弧焊的焊接方法堆焊12Cr2Mo1V材质凸台本体的工艺可行性.研究结果表明,在12Cr2Mo1V钢上采用附加填充丝埋弧焊进行本体堆焊,焊接工艺性良好;其工艺评定试验的各项力学性能完全满足母材的要求,特别是-30℃夏比KV2型缺口冲击试验冲击值均≥54 J,抗回火脆化倾向评定试验结果均满足vTr54+3ΔvTr54≤0℃的要求.与单丝埋弧堆焊相比,两枪六丝附加填充丝埋弧堆焊凸台可提高生产效率200%~250%.该项工艺研究在满足加钒钢凸台性能的前提条件下,能极大缩短凸台制造周期、节能减排,为加氢反应器先进绿色制造的发展提供了新的制造手段.

The boss of the 12Cr2Mo1V steel hydrogenation reactor shell is usually welded by single-wire submerged arc welding,which has low manufacturing efficiency.The feasibility of welding the 12Cr2Mo1V boss body by using the welding method of additional filler wire submerged arc welding was studied.The research results show that the welding processability is good when the additional filler wire submerged arc welding is used for body cladding on 12Cr2Mo1V steel;the mechanical properties of its process qualification test fully meet the requirements of the base metal,especially the KV2 impact value of the-30℃Charpy notch impact test is≥54 J,and the results of the temper embrittlement resistance tendency evaluation test meet the requirements of vTr54+3ΔvTr 54≤0℃.Compared with single-wire submerged arc welding,boss submerged arc welded by two guns with six-wire additional filler wires can increase production efficiency by 200%to 250%.Under the premise of meeting the performance of vanadium-doped steel boss,this process research can greatly shorten the boss manufacturing cycle,save energy and reduce emissions,and provide a new manufacturing method for the development of advanced green manufacturing of hydrogenation reactors.

王雪骄;何鹏;晏君文;吴成林

二重(德阳)重型装备有限公司,四川德阳 618000

机械工程

附加填充丝埋弧焊12Cr2Mo1V钢凸台堆焊

compound cold wire submerged arc welding(multiple gun silk)12Cr2Mo1V steelbosscladding

《压力容器》 2024 (004)

16-21,79 / 7

10.3969/j.issn.1001-4837.2024.04.003

评论