| 注册
首页|期刊导航|压力容器|12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究

12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究

王雪骄 何鹏 晏君文 吴成林

压力容器2024,Vol.41Issue(4):16-21,79,7.
压力容器2024,Vol.41Issue(4):16-21,79,7.DOI:10.3969/j.issn.1001-4837.2024.04.003

12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究

Research of submerged arc welding buildup technology of 12Cr2Mo1V steel boss using additional filing wire

王雪骄 1何鹏 1晏君文 1吴成林1

作者信息

  • 1. 二重(德阳)重型装备有限公司,四川德阳 618000
  • 折叠

摘要

Abstract

The boss of the 12Cr2Mo1V steel hydrogenation reactor shell is usually welded by single-wire submerged arc welding,which has low manufacturing efficiency.The feasibility of welding the 12Cr2Mo1V boss body by using the welding method of additional filler wire submerged arc welding was studied.The research results show that the welding processability is good when the additional filler wire submerged arc welding is used for body cladding on 12Cr2Mo1V steel;the mechanical properties of its process qualification test fully meet the requirements of the base metal,especially the KV2 impact value of the-30℃Charpy notch impact test is≥54 J,and the results of the temper embrittlement resistance tendency evaluation test meet the requirements of vTr54+3ΔvTr 54≤0℃.Compared with single-wire submerged arc welding,boss submerged arc welded by two guns with six-wire additional filler wires can increase production efficiency by 200%to 250%.Under the premise of meeting the performance of vanadium-doped steel boss,this process research can greatly shorten the boss manufacturing cycle,save energy and reduce emissions,and provide a new manufacturing method for the development of advanced green manufacturing of hydrogenation reactors.

关键词

附加填充丝埋弧焊/12Cr2Mo1V钢/凸台/堆焊

Key words

compound cold wire submerged arc welding(multiple gun silk)/12Cr2Mo1V steel/boss/cladding

分类

机械制造

引用本文复制引用

王雪骄,何鹏,晏君文,吴成林..12Cr2Mo1V钢凸台附加填充丝埋弧堆焊工艺研究[J].压力容器,2024,41(4):16-21,79,7.

压力容器

OA北大核心CSTPCD

1001-4837

访问量1
|
下载量0
段落导航相关论文