河南水利与南水北调2024,Vol.53Issue(6):15-16,2.
某干渠现状分析与改造提升方案比选
The Analysis of the Current Situation of a Main Canal and the Comparison of Upgrade Scheme
万伟1
作者信息
- 1. 新野县鸭河口灌区服务中心,河南 新野 473500
- 折叠
摘要
Abstract
The analysis of the current situation of Yadong Main Canal in Yahekou irrigation area,as well as the comparison of channel transformation and upgrading scheme,hold significant engineering importance for implementing the national strategic deployment of modernizing irrigation area transformation and upgrading.This will effectively address practical issues associated with the present state of Yadong Main Canal.Therefore,based on the general situation of Yadong Main Canal project in Yahekou irrigation district,the current situation of Yadong Main Canal is analyzed from the aspects of seepage analysis and stability review of the canal.Then,the necessity of the reconstruction of Yadong Main Canal is expounded.Three reconstruction schemes of reinforced concrete rectangular channel,concrete side wall+concrete floor rectangular channel,trapezoidal earth channel+concrete lining are compared.The suitable reconstruction scheme is selected and compared from the aspects of initial section size,construction content and comprehensive analysis.Finally,the reconstruction and upgrading scheme of Yadong Main Canal is selected as the typical design of the upgrading of the channel with pile number 1+820 to 4+348 and 8+050 to 8+550.It can also provide a reference for similar engineering practice.关键词
鸭河口灌区/鸭东干渠/渠道改造方案/比选Key words
Yahekou irrigation area/Yadong Main Canal/channel reconstruction scheme/comparison and selection分类
农业科技引用本文复制引用
万伟..某干渠现状分析与改造提升方案比选[J].河南水利与南水北调,2024,53(6):15-16,2.