穿越构筑物压力管道顶进施工方案

严建平

河南水利与南水北调2024,Vol.53Issue(5):48-49,2.
河南水利与南水北调2024,Vol.53Issue(5):48-49,2.

穿越构筑物压力管道顶进施工方案

The Construction Scheme for Pressure Pipe Jacking Through Structures

严建平1

作者信息

  • 1. 新疆水发建设集团有限公司库木苏项目部,新疆 乌鲁木齐 830000
  • 折叠

摘要

Abstract

Water Diversion Tunnel is widely utilized due to its ability to significantly shorten the distance of water diversion and minimize the impact on ground ecology.The pipe jacking construction of a water transmission pipeline project necessitates traversing through complex structural and environment conditions,thereby posing inherent risks to the construction process.The grouting method is employed to enhance the foundation and improve the strength and stability of the soil,aiming to minimize disruption to the ongoing project while ensuring its safety.The method of grouting reinforcement is employed to enhance the foundation and improve the strength and stability of the soil,aiming to minimize disruption to the existing project while ensuring its safety.During the construction of pipe jacking,strict adherence to the requirements of construction technology is essential.and may be encountered in drift stone,the split method for treatment and other technical measures.The practical results demonstrate the effectiveness of the adopted construction measures in meeting the requirements of the project,providing valuable insights for similar engineering endeavors.

关键词

顶管/穿越/注浆/施工方案

Key words

pipe jacking/crossing/grouting/construction scheme

分类

水利科学

引用本文复制引用

严建平..穿越构筑物压力管道顶进施工方案[J].河南水利与南水北调,2024,53(5):48-49,2.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文