考虑物流特性用于削峰填谷的纯电重卡双层协调优化调度方法
A Two-layer Coordinated Optimization Dispatch Method of Electric Trucks for Peak Shaving and Valley Filling Considering Logistics Characteristics
摘要
Abstract
To address the problems of large load peak and high operating costs brought by the large-scale charging of electric trucks to the power grid,a two-layer coordinated optimal dispatch method is proposed for peak shaving and valley filling.Firstly,load prediction of electric trucks is carried out by considering logistic characteristics,acquiring the driving behaviour of electric trucks,and obtaining charging load curves.Fuzzy C-mean clustering is used to divide the charging loads into dispatchable and non-dispatchable categories,and the schedulable potential is measured.Secondly,the minimum variance of total load is selected as the objective function.The upper layer optimization model is constructed,and the daily charging scheme of electric trucks is formulated.Then,the optimal daily charging scheme of the upper layer is transferred to the lower layer,and the lower layer optimization model with the lowest operating cost of the electric trucks as the objective function is constructed by considering the flexible time window constraints.The two-layer optimization dispatch is implemented with the variance of charging loads and the operating cost.Finally,the two-layer optimization model is solved by an adaptive particle swarm algorithm under the master-slave game framework,and the simulation verification is carried out using actual electric truck data in a logistics park.The results show that the proposed two-layer optimization dispatch method can effectively achieve smoothing the load profile of the grid while reducing the operating costs of electric trucks.关键词
纯电重卡/双层优化/削峰填谷/柔性时间窗/物流特性Key words
electric trucks/two-layer optimization/peak shaving and valley filling/flexible time window/logistics characteristics分类
信息技术与安全科学引用本文复制引用
胡文东,田志杰,陈嘉瑞,纪陵,余洋..考虑物流特性用于削峰填谷的纯电重卡双层协调优化调度方法[J].全球能源互联网,2024,7(4):421-430,10.基金项目
国家电网有限公司科技项目(kj2022-050). Science and Technology Foundation of SGCC(kj2022-050). (kj2022-050)