| 注册
首页|期刊导航|陕西煤炭|车村煤矿一号井综采工作面沿空留巷技术实践

车村煤矿一号井综采工作面沿空留巷技术实践

周海涛

陕西煤炭2024,Vol.43Issue(8):134-140,7.
陕西煤炭2024,Vol.43Issue(8):134-140,7.DOI:10.20120/j.cnki.issn.1671-749x.2024.0826

车村煤矿一号井综采工作面沿空留巷技术实践

Technological practice of gob-side entry retaining of fully mechanized working face in No.1 shaft of Checun Coal Mine

周海涛1

作者信息

  • 1. 延安市车村煤矿一号井,陕西延安 717300
  • 折叠

摘要

Abstract

In order to improve coal mining rate and realize fully green mining,the successful experiences of nearby coal mines are introduced to No.1 shaft of Checun Coal Mine,and the technical practice of gob-side entry retaining by pre-frac-ture roof cutting is carried out.The stress distribution of surrounding rock is optimized by blasting pre-fracture,control of blasting hole's location,angle and explosive doses;increasing the temporary support of single hydraulic support,cutting the stress transfer of voussoir beam,and change of old roof posture.The mechanized working face of 3101 is retained as the re-turn air entry of the 3102 working face,and the retained coal pillars between the upper and lower working face are canceled,thus avoiding coal pillar-caused spontaneous combustion of coal seam,reducing the waste of coal resources,easing the issue of working face's continuity,and realizing the safe and efficient mining of working face's gob-side entry retaining.

关键词

综采工作面/沿空留巷/预裂切顶/运输顺槽/预留煤柱

Key words

fully mechanized working face/gob-side entry retaining/pre-fracture roof cutting/transportation mining road-way/retained coal pillar

分类

矿山工程

引用本文复制引用

周海涛..车村煤矿一号井综采工作面沿空留巷技术实践[J].陕西煤炭,2024,43(8):134-140,7.

陕西煤炭

1671-749X

访问量0
|
下载量0
段落导航相关论文