马道水文站单断沙关系分析OA
Analysis of Single Break Sediment Relationship in Madao Hydrology Station
在新时代水文环境下,基层测站面临所处地理位置偏远,生活不便,人员减少的现状.在这样的背景下,如何减轻减少基层水文测站员工繁重的工作任务,精简测验内容,提高新仪器、新测验设备在基层测站的应用已势在必行,这样能有效提高测验精度,对实现水文巡测化模式工作的全面开展,具有重要的作用.现根据马道水文站建立以来收集的实测输沙率资料,采用算数平均法推求综合换算系数,建立历年综合单断沙关系,然后对关系线进行分析、检验,以期建立单断沙相应关系,简化工作人员在单断沙方面工作的强度,实现输沙率停测或间测的目的.
In the hydrological environment of the new era,the base station is faced with the status of remote location,inconvenient life and reduced personnel.In this context,it is imperative to reduce the heavy work tasks of the staff of the basic hydrologic station,simplify the test content,and improve the application of new instruments and new test equipment in the basic hydrologic station,which can effectively improve the test accuracy and play an important role in realizing the comprehensive development of the hydrologic patrol and survey mode.Based on the data of measured sediment transport rate collected since the establishment of Madao Hydrology Station,the comprehensive conversion coefficient is calculated by means of arithmetic average method,and the comprehensive single sediment break relationship is established over the years,then the relationship line is analyzed and tested.In order to establish the corresponding relationship of single break sediment,simplify the work intensity of the staff in single break sediment,and realize the purpose of stopping or interval measurement of sediment transport rate.
徐骏;潘忠海
汉中水文水资源勘测中心,陕西汉中 723000烟台市水文中心,山东烟台 264000
地球科学
马道水文站单断沙关系停测间测巡测
Madao hydrological stationsingle break sediment relationshipstop measurement and intermittent measurementpatrol measurement
《陕西水利》 2024 (007)
30-33 / 4
评论