中运河(骆马湖—成子湖段)输水潜力研究
Study on the water conveyance potential of the middle canal(Section of Luoma Lake to Chengzi Lake)
李小红 1蒋肇冰 1王凯 1丁国莹 1刘兴华2
作者信息
- 1. 江苏省水利勘测设计研究院有限公司,江苏南京 210029
- 2. 浙江国贸集团东方机电工程股份有限公司,浙江杭州 310016
- 折叠
摘要
Abstract
The middle canal is an important component of the Beijing Hangzhou Grand Canal and also serves as the main water channel for the first phase of the eastern route of south-to-north water diversion project.It has comprehensive functions such as flood control,drainage,navigation,and water supply.The first phase of the eastern route of south-to-north water diversion project in Jiangsu Province is an expansion and northward extension of the existing the project of diverting water from the south to the north of the Yangtze River.In order to promote the subsequent construction of the eastern route of south-to-north water diversion project and fully tap into the water transport potential of the first phase of the project,it is necessary to further study the current water transport capacity of the canal in this section,and reasonably determine the current water transport scale of the canal under comprehensive consideration of various related factors,providing technical support for the subsequent construction of the eastern route of south-to-north water diversion project.关键词
南水北调/输水能力/综合利用/耦合模型Key words
south-to-north water diversion/water transmission capacity/comprehensive utilization/coupling model分类
建筑与水利引用本文复制引用
李小红,蒋肇冰,王凯,丁国莹,刘兴华..中运河(骆马湖—成子湖段)输水潜力研究[J].江苏水利,2024,(10):20-23,4.