摘要

Abstract

Frequent water inrush disasters in mountainous highway tunnels pose a serious threat to construction safety.To establish a quantitative and precise prevention and control method for water inrush disasters in mountainous highway tunnels by determining the minimum safe detection distance,thereby enhancing the safety and reliability of advanced geological predictions.A multifactor coupling analysis framework was developed by comprehensively considering three core disaster-inducing factors:construction disturbances(influenced by rock hardness),surrounding rock load(arching effect),and water-bearing structures(risk of extrusion breakthrough).Four calculation formulas(disturbance thickness,load height,protective thickness,and comprehensive detection distance)and 13 evaluation indicators were established to construct a quantitative model and complete indicator system.Safety thresholds based on minimum protective thickness were determined through a mechanical mechanism analysis and engineering parameter calibration.The reliability and advancement of the model were verified by comparison with traditional empirical methods using typical tunnel inrush cases.Engineering validation demonstrated that this method offers advantages such as multi-factor quantification,clear mechanisms,and high safety compared with traditional empirical approaches.It achieves a shift from passive reliance on experience to active quantitative control,significantly improving detection efficiency and providing a technically standardized solution for advanced geological prediction.This study provides a standardized quantitative tool for the early warning of tunnel construction disasters,significantly enhancing the initiative and reliability of prevention and control measures.

关键词

山区公路隧道突涌灾害/超前地质预报/工程扰动厚度/围岩荷载高度/最小保护厚度/累积影响范围/最小安全探测距离

Key words

mountain highway tunnel water and mud inrush/advanced geological prediction/engineering disturbance thickness/surrounding rock load height/minimum protective thickness/cumulative impact range/minimum safe detection distance

分类

天文与地球科学

引用本文复制引用

刘永良,郭松林,徐晨,尹小涛..隧道突涌灾害最小超前探测距离估值方法研究[J].CT理论与应用研究,2026,35(3):468-476,9.

基金项目

中建基础科技研发课题(公路隧道富水构造中距离全空间瞬变电磁探测技术研究及应用(CSCIC-2022-KT-(04))) (公路隧道富水构造中距离全空间瞬变电磁探测技术研究及应用(CSCIC-2022-KT-(04)

国家自然科学基金(深埋膨胀岩隧洞围岩吸水-膨胀-软化的多尺度耦合分析方法与致灾机制研究(42377177)). (深埋膨胀岩隧洞围岩吸水-膨胀-软化的多尺度耦合分析方法与致灾机制研究(42377177)